Calculator
Power factor
correction calculator.
Estimate the capacitor bank needed to raise a load’s power factor, and how much it lowers the current from the supply — a quick check before you plan a switchboard and request a quotation.
An estimate for planning and enquiries, for a balanced three-phase load. The bank’s rating, steps and any detuning follow the electrical designer’s study and the manufacturer’s data.
How the estimate works
- tan φ = √(1 − power factor²) ÷ power factor, for the present and the target power factor
- Capacitor bank at the target (kVAR) = real power (kW) × (tan φ present − tan φ target)
- With spare capacity = capacitor bank × (1 + spare capacity)
- Apparent power (kVA) = real power ÷ power factor, now and at the target
- Line current (A) = apparent power × 1,000 ÷ (√3 × system voltage)
- Current reduction (%) = (1 − present power factor ÷ target power factor) × 100
- A target at or below the present power factor needs no correction, so the bank shows 0
What correction changes
Motors, transformers and other inductive loads draw reactive power (kVAR) as well as real power (kW). A capacitor bank supplies that reactive power on site, so less current flows from the transformer and through the cables and switchgear that feed the bank. The real power the load uses stays the same; the apparent power, the current and the losses in the supply fall. The lower current can also free capacity on a transformer that runs close to its rating — see the transformer kVA calculator.
Power factor charges in Thailand
PEA’s tariff from the September 2026 billing month charges customers who are billed for demand, and MEA’s Large General Service tariff charges its customers, for each kVAR by which the maximum 15-minute reactive power demand exceeds 61.97% of the maximum 15-minute active power demand, in a month when the power factor is lagging. That limit is a power factor of about 0.85. Check the current rates and conditions with the utility: PEA tariff, September 2026 and MEA Large General Service tariff.
Before you choose a bank
- Use measured demand and power factor where you can — from the main meter or a power quality logger — rather than nameplate ratings
- A load that changes through the day needs an automatic bank that switches capacitor steps in and out; a fixed bank sized for full load can make the power factor leading at light load
- Variable speed drives, UPS systems and other non-linear loads add harmonics, which can overload capacitors and cause resonance with the supply transformer. Where they are a large share of the load, designers use detuned banks with series reactors; a harmonic measurement shows whether a site needs one
Next, see switchgear and switchboards or size the transformer, then send your single-line diagram for a quotation.
Keep reading
Related.
Schneider Electric
Switchgear and circuit breakers.
Medium-voltage switchgear, circuit breakers and low-voltage distribution from Schneider Electric — supplied for buildings, plants and utility projects in Thailand, and exported to the UAE, Saudi Arabia and the Maldives.
See the products: Switchgear and circuit breakers.Calculator